A Build Diary

This sequence of images shows the ten-day process of a ‘Bug being assembled.

More than a hundred intricate marine-plywood parts are cut on a CNC machine. Which itself is made from timber.

Every part is hand-sanded…

…and many of them are varnished…

…before being assembled to make the cores of the lightweight side panels.

Meanwhile, the floor is machined…

…coated underneath with two layers of epoxy, and fitted to the chassis.

Then the assembly proper can begin…

…quickly resulting in the bare frame of the pod…

…onto which the inner skin of the roof is applied.

A set of between-the-skins longerons stiffen the roof, and extra insulation within the air-gap prevents condensation inside the pod during challenging camping conditions.

After wiring the internal lights and power sockets, the aluminium skin is applied…

…and then the side outer skins to create a double-walled structure.

Meanwhile, the double-walled doors have been assembled…

…and glazed with UV-proofed scratch-resistant polycarbonate…

…and the curved seat-backs have been cold-moulded to shape on CNC’d formers (with some low-tech washing pegs to assist).

Finally, a further day of fitting-out results in the finished PhieldBug, seen here with temporary protective plastic still on the glazing…